title: "Dual-Train Electric Heating for a Gas Dehydration Project"
url: "https://xgthermal.com/projects/dual-train-regeneration-gas-heating/"
language: "en"
---

# Dual-Train Electric Heating for a Gas Dehydration Project

Two 600 kW indirect electric heating skids supply heat for molecular sieve regeneration at a natural gas processing facility in Xinjiang, China.

Project overview

## Application and supply scope.

The project configuration below summarizes the supplied equipment and its process application.

Year

2026

Region

Xinjiang, China

Application

Molecular sieve regeneration gas heating

Installed heater power

2 × 600 kW (1,200 kW total)

Supply scope

Two indirect electric thermal oil heating skids

Operating arrangement

Duty/standby or parallel operation

![Installed thermal oil heater skid with insulated piping, electrical cabinets and an elevated expansion vessel](https://xgthermal.com/_astro/overview.DlNZdgNS.webp)

One of the heating skids during site installation, with the electrical cabinets and elevated platform in view.

The engineering challenge

## Conditions shaping the heating duty.

The gas dehydration unit required regeneration gas to be heated from 50 °C to 230–240 °C. The heating system also had to accommodate outdoor winter conditions and changes in load across the regeneration cycle.

The project used two 600 kW skids in a common installation area. The two-train arrangement gives operators the option of duty/standby or parallel operation, depending on the heating demand.

Equipment configuration

## What the package includes.

Equipment capacities, interfaces and controls are matched to the project application.

Heating arrangement

Electric resistance heating with an indirect thermal oil circuit

Gas flow per skid

2,600 m³/h

Gas outlet target

230–240 °C

Gas-side exchanger design pressure

4.0 MPa

Control

PLC with touchscreen and Modbus RTU/TCP

Heater Ex marking

Ex d IIB T4

Package scope & interfaces

## Beyond the heater body.

The integration and handover scope documented for this project.

### Thermal equipment

Insulated electric heater with tubular elements, shell-and-tube gas exchanger and an initial thermal oil fill.

### Circulation and access

Air-cooled horizontal centrifugal pump, nitrogen-blanketed expansion vessel, and an access platform with stairs.

### Power, controls and instruments

PLC cabinet with a 10-inch touchscreen, Pt100 temperature sensing, pressure transmitters and a magnetostrictive level transmitter.

Site photography

## Heater and electrical cabinets

![Bolted heater end cover, flanged connections and insulated piping on the installed skid](https://xgthermal.com/_astro/heater.CE_X5KR-.webp)

The heater end cover and flanged connections during installation.

![Site technician beside the heating skid’s electrical cabinet lineup](https://xgthermal.com/_astro/cabinet-lineup.BwZw8ejd.webp)

A site technician beside the electrical cabinets, showing the scale of the installation.

Technical specifications

## F-101 and F-102 equipment and design data

Flow, efficiency, load range, temperature control accuracy and design life are values listed in the project specification.

| Parameter | Specification |
| --- | --- |
| Equipment tags | F-101 / F-102 (two units) |
| Rated power | 600 kW per unit (1,200 kW total) |
| Process medium | Molecular sieve regeneration gas (natural gas) |
| Gas flow per unit | 2,600 m³/h |
| Gas inlet temperature | 50 °C |
| Gas outlet temperature | 230–240 °C |
| Process gas operating pressure | 2.8–4.0 MPa(g) |
| Gas-side exchanger design pressure | 4.0 MPa |
| Process connections | DN100 |
| Heating method | Electric resistance heating with an indirect thermal oil circulation loop |
| Specified thermal efficiency | ≥95% |
| Specified load range | 20–120% |
| Specified temperature control accuracy | ±2 °C |
| Explosion protection | Ex d IIB T4 |
| Ingress protection | IP65 |
| Power supply | 380 VAC / 50 Hz |
| Control system | PLC, 10-inch touchscreen and Modbus RTU/TCP |
| Project ambient temperature range | −35.9 to 42.9 °C |
| Design life | 20 years |

Our approach

## Engineering the complete heating package.

### Transfer heat through a separate circuit

Tubular electric elements heat the thermal oil. The circulation pump sends the oil to a shell-and-tube exchanger, where the regeneration gas absorbs heat on the tube side before flowing to the molecular sieve beds.

### Match heating output to the cycle

The PLC adjusts output using gas outlet temperature feedback. The project specification also lists remote start and stop, overtemperature shutdown and automatic cold-weather protection.

### Prepare for cold outdoor conditions

The installation uses cabinet heaters, instrument freeze protection and electric tracing on drain lines. The specified ambient range extends down to −35.9 °C.

Project value

## Delivery and application value.

### Flexible capacity across two skids

The duty/standby or parallel arrangement gives the operator flexibility to stage the available heating capacity and isolate a train for service when the process demand permits.

### Factory integration before installation

The thermal, electrical and control systems were preassembled and checked at the factory. Site work focused on connecting the skids to plant piping, power and controls.

Related solution

## Natural Gas Heating & Preheating

Explore electric heating options for gas treatment, regeneration and other process gas duties.

[Explore the solution](https://xgthermal.com/solutions/natural-gas-heating-preheating/)