title: "Pipeline Delivery Station Gas Heating Project"
url: "https://xgthermal.com/projects/pipeline-delivery-station-gas-heating/"
language: "en"
---

# Pipeline Delivery Station Gas Heating Project

Two 100 kW heating skids arranged for duty and standby service at a natural gas delivery point.

Project overview

## Application and supply scope.

The project configuration below summarizes the supplied equipment and its process application.

Year

2024

Region

Hunan, China

Application

Gas delivery and pressure-reduction heating

Supply scope

Two integrated electric heater skids

![Installed electric gas heating skids and station piping](https://xgthermal.com/images/projects/qianjiang-shaoguan-no28-electric-heater-skids-site.webp)

Electric heating skids installed with the station piping.

The engineering challenge

## Conditions shaping the heating duty.

Pressure-reduction cooling at a new pipeline delivery point created hydrate and freeze-blockage risks for downstream station equipment.

The site required hazardous-area equipment, continuity of gas supply and local operation with remote visibility.

Equipment configuration

## What the package includes.

Equipment capacities, interfaces and controls are matched to the project application.

Installed arrangement

2 × 100 kW; one duty + one standby

Equipment

Vertical explosion-proof resistance heater skids

Control

Local HMI; automatic outlet-temperature regulation

Communication

RS485 Modbus RTU / SCADA

Field configuration

Ex d IIB T4 Gb; IP65

Protection

Two-stage overtemperature, low flow, pressure relief and electrical protection

Package scope & interfaces

## Beyond the heater body.

The integration and handover scope documented for this project.

### Skid assembly

Two 100 kW heater skids with piping, valves, relief equipment and instruments.

### Electrical & controls

Junction boxes, control cabinets, local HMI and outlet-temperature regulation.

### Plant interfaces

Defined mechanical and electrical boundaries with RS485 Modbus RTU / SCADA communication.

Our approach

## Engineering the complete heating package.

### Duty and standby arrangement

Two complete 100 kW skids allow standby availability for maintenance or protected shutdown, subject to the station operating strategy.

### Factory-integrated supply

The scope includes heater bodies, piping, valves, relief equipment, instruments, junction boxes and control cabinets, giving the site a defined mechanical and electrical connection boundary.

### Temperature and protection logic

Closed-loop outlet-temperature control is combined with staged overtemperature and low-flow protection. Modbus communication supports setpoint exchange, power feedback, alarms and status monitoring.

Project value

## Delivery and application value.

### Process objective

The packages provide temperature compensation around pressure reduction to reduce hydrate and ice-blockage risk and support downstream valves and instruments.

### Delivery value

Integrated skid supply reduces dispersed site assembly. No quantified availability or commissioning-time improvement is claimed in this summary.

Related equipment

## Indirect Electric Gas Heater

Explore the equipment family and engineering considerations relevant to this application.

[View Product Details](https://xgthermal.com/products/natural-gas-line-heater/)