Project Description
The Qianjiang-Shaoguan gas pipeline No.28 valve chamber retrofit added a natural gas download point for downstream distribution in Leiyang, Hunan. The new branch required reliable temperature compensation before gas entered the distribution station, especially under pressure-reduction conditions where Joule-Thomson cooling can create hydrate formation, ice blockage, and low-temperature stress on downstream equipment.
XGTHERMAL supplied two 100kW skid-mounted explosion-proof electric resistance heater packages in a one duty and one standby arrangement. The scope included the heater bodies, explosion-proof junction boxes, control cabinets, skid piping, valves, safety relief equipment, measurement instruments, and technical service for integrated delivery.